Millfield School – School Science Laboratory Refurbishment

Glastonbury, Somerset, BA6 8LD | 5 Identical Science Labs - Turnkey Science Refurbishment

Project Brief

5 Identical Science Labs – Turnkey Science Refurbishment

Once Labform were awarded this contract, we worked closely with the client to establish their exact requirements

A bespoke system is what was required to suit practical and theory lessons

Whilst smaller class sizes were on the agenda at this school

It is always a challenge to design and fit everything into the labs without compromising on the feel of space

Emergency stop units were installed in all 5 labs, providing separate use for gas, electric and water as required

Turnkey Science Refurbishment

The colour choice of the client was enhanced further with the decoration of the entrance / exit doors to the labs in the same RAL colour

The heating system was also upgraded

Each of the labs having 4no. thermostatically controlled heaters installed by Labform

Even the resident ducks came in to see how things were progressing

They seemed quite impressed with the transformation, even in the early stages of the project

Resident Ducks at Millfield School - Turnkey Refurbishment

A project of this size always provides a few challenges along the way, and this one was no exception

We are sure that the pupils and staff will enjoy the labs going forward

https://www.facebook.com/labformgroup/

The color choice of the client was enhanced further with the decoration of the entrance / exit doors to the labs in the same REAL color

The heating system was also upgraded, with each of the labs having no. thermostatically controlled heaters installed

Even the resident ducks came in to see how things were progressing, and seemed impressed with the transformation, even in the early stages

The heating system was also upgraded, with each of the labs having no. thermostatically controlled heaters installed

Even the resident ducks came in to see how things were progressing, and seemed impressed with the transformation, even in the early stages

Project Testimonial


Millfield School – School Science Laboratory Refurbishment
Glastonbury, Somerset, BA6 8LD
Back to Case Studies

More Case Studies

Eco Lab – Laboratory Refurbishment
Tiffin Girls School – Science Lab Refurbishment
Burnley College – Lab Refurbishment