Science Laboratory Design
Bacons College were looking to refurbish all of their “Eight” science laboratories
Once the project had been quoted, we were invited back in to present to the “Senior Management Team” at the college
The purpose of this meeting was to demonstrate why Labform Limited should be awarded this contract over our competitors
3D drawings
Sample cupboards
Sample worktops
Flooring Samples
Other key information
This convinced the college that they were making the correct decision in choosing Labform for their refurbishment works
The project was spread over 2 Summer Holidays (6 Labs) and also an Easter Break of 2 weeks (2 Labs)
Suspended Ceiling / Inset Lighting
New Flooring
Decoration
New Distribution Boards / Gas Proving Systems
Furniture (Fixed)
Furniture (Loose)
The works included a TWO year furniture guarantee, as well as a TWO year building works guarantee* (Both unique to the education market place)
I a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a
a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a aThea a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a aa a a a a a a a a a a
Great experience working with Labform