Aylesbury High School invited several contractors to tender for this science laboratory refurbishment

The contract was awarded to Labform following several in depth meetings with the client, architect and M&E consultant

Work started on site during the Easter holidays and continued on into school term time as per the contract agreement

Amongst the contract works were

  1. Re-board and plaster all walls
  2. New internal doors
  3. Suspended ceiling and inset LED lighting
  4. Disconnect / Reconnect existing Fume cupboard ducting
  5. Mechanical ventilation heat recovery unit (MVHR) Supply, installation and commission
  6. New furniture to clients design (Velstone worktops)

The delivery of this project, meant that Labform had to work very closely with the client, M&E consultant as well as the Architect, which involved weekly site meetings

Overall, this was achieved, and the project ran very smoothly, and was delivered on time and within budget

A 6 month retention period was written into the contract, and on final inspection following the 6 month period there were “Zero” reported snagging items to complete

As a business we are very proud of, and demonstrates our keen eye for detail when refurbishment educational premises

Share this post

Berkshire
School Lab Furniture (Space Station Design)

Eagle House – School Lab Furniture

0 Comments

School Lab Furniture (Space Station Design) Labform were invited in to discuss the schools vision for refurbishing two of the […]

Jubilee High School (Science Laboratory Furniture)

0 Comments

During the summer of 2018 we supplied and installed the furniture to 3no. Science Labs at Jubilee High School in […]

Aylesbury High School – Science Lab Refurbishment

0 Comments

Aylesbury High School invited several contractors to tender for this science laboratory refurbishment The contract was awarded to Labform following […]

Scroll to Top